Sample result

16 × 16 in 8-#9 f′c 5,000 psi fy 60 ksi About X 3 load cases Full inputs

Checked about X: depth h = 16 in

This is a live sample output for a 16×16 in rectangular tied column with 8-#9 longitudinal bars (f′c = 5,000 psi, Grade 60), checked per ACI 318-19 under Pu = 200 kip and M2 = 60 kip-ft. The same section is verified against StructurePoint's published spColumn reference; see the verification pages, the full report (PDF) and the methodology. Run your own column to get an editable .docx calc-note.

PASS

All 3 load cases pass (D/C ≤ 1.00). Governing: LC2 (D/C 0.80).

Load case summary (3 cases, governing highlighted)
Case Pu (kip) Mu (kip-ft) D/C Verdict
LC1 400.00 150.00 0.76 PASS
LC2 (governs) 600.00 100.00 0.80 PASS
LC3 200.00 60.00 0.33 PASS
Explore design alternatives

Compare lighter, heavier, and alternative reinforcement configurations side by side.

P-M interaction diagram

P-M interaction diagram showing demand point against the φ-reduced capacity envelope

Demand (Pu, Mu) tested against the φ-reduced capacity envelope. Operating point (φPn, φMn) shown on the boundary. φ is computed per anchor from εt (§21.2.2); your operating point lies in the compression-controlled region; how the φ transition works.

Interaction Diagram Points ACI 22.4.2 (8 anchors, ACI 318-19 Table 22.4.2.1)
Anchor Description c (in) εt φ φPn (kip) φMn (kip-ft)
1 Pure compression cap N/A N/A 0.65 797.68 0.00
2 Cap intersection 17.35 -0.00067 0.65 797.64 102.66
3 Compression-controlled limit (εt = εty) 7.99 0.00207 0.65 270.89 250.77
4 Transition lower (εt = εty + 0.0015) 6.17 0.00357 0.78 221.10 272.57
5 Tension-controlled limit (εt = εty + 0.003) 5.02 0.00507 0.90 171.64 286.75
6 Tension-controlled deep (εt = εty + 0.008) 3.10 0.01007 0.90 -3.74 212.22
7 Pure bending 3.25 0.00946 0.90 0.00 213.93
8 pure_tension N/A N/A 0.90 -432.00 0.00
Strength-reduced interaction curve ACI 318-19 §22.4.2 · §21.2.2
Detail for governing case: LC2 (D/C 0.80)
Quantity Value
Pu (factored axial demand, kip) 600.00
φPn (axial capacity at operating point, kip) 748.33
Mu (= M2, design moment, kip-ft) 100.00

No transverse load between supports. Cm from end-moment ratio per ACI 318-19 §6.6.4.5.3(a).

φMn (moment capacity, kip-ft) 124.72
c (neutral axis depth, in) 16.05
εt (extreme tension strain) -0.00048
φ (strength reduction factor) 0.65
φ regime (§21.2.2) Compression-controlled φ = 0.65 throughout (εt ≤ εty = 0.00207) ACI Table 21.2.2
D/C axial 0.80
D/C moment 0.80
kl/r about X 25.00

Nonsway frames only (ACI 318-19 §6.6.4.3).

The other axis (about Y) was not checked. kl/r about Y = 25.00, which exceeds the worst-case short-column limit of 22 (actual limit depends on the other-axis moments). Run the check about Y separately. Run about Y

kl/r limit 28.00
Tie spacing limit (§25.7.2.1) 16.00 in (governed by b)
Bar clear spacing (§25.2.3) 2.54 in ≥ 1.69 in
Force Decomposition at Operating Point Per-bar detail (c = 16.05 in, a = 12.84 in)
Component Force (kip) Moment (kip-in)
Cc (concrete compression) 873.03 1,379.99
Cs (steel in compression) 278.26 922.58
Ts (steel in tension) 0.00 0.00
Total = Pn, Mn 1,151.28 2,302.57
Layer Bars d (in) εs fs (ksi) Force (kip) Lever (in) Moment (kip-in)
1 4 2.50 0.00253 60.00 223.00 5.50 1,226.50
2 4 13.50 0.00048 13.81 55.26 -5.50 -303.92
Whitney stress block, ACI 318-19 §22.2.2.4.1 εcu = 0.003
Input summary (values as entered)
Section geometry
Section 16 × 16 in (rectangular)
Ag (gross area) * 256.0 in²
Ast (total steel area) * 8.00 in²
ρ (reinforcement ratio) * 0.0312 (3.12%)
Materials
f′c 5,000 psi
fy (longitudinal) 60 ksi (Grade 60)
Concrete Normal weight
Reinforcement
Longitudinal bars 8-#9
Per-face distribution 2 per b-face, 0 per h-face (+ 4 corners)
Clear cover 1.561 in
Transverse #3 ties @ 12 in
Loads
Pu 600 kip
M2 (larger end moment) 100 kip-ft
M1 (smaller end moment) 50 kip-ft
Curvature Single
Bending axis X
Transverse load between supports No
Slenderness parameters
Lu (unsupported length) 120 in (10.00 ft)
k (effective length factor) 1
* Derived from entered dimensions and reinforcement; not directly entered.

Assumptions and limits

  • Tie arrangement and crossties (§25.7.2.3) are not checked.

Pro tier · in development

More capabilities are on the way as calcnote grows. Pricing under discussion; help shape it.

Join waitlist →
Sign in to save your calculations and preview project documents.

Download

Same calc note in either format.

Tell us what worked (or didn't)

calcnote is in active development. What would make this output more useful for your work? What's missing? What looked wrong? Short or long, we read every reply.

Verdict method 9 · build 5ee7a83 · generated 2026-11-24 04:18 UTC